el-GRen-US
Language
Search
× Search
Saturday, November 23, 2024

NSRF

Partnership Agreement

Βουλή των Ελλήνων
/ Categories: ΕΣΠΑ, Νέα, Νέα

"Energy Upgrade of the Parliament Building of the Hellenic Parliament"

Budget: 2,996,760.00€

Funding program: O.P. "TRANSPORT INFRASTRUCTURE, ENVIRONMENT & SUSTAINABLE DEVELOPMENT. Internet Uploading Number: (IUN) 758Δ465ΧI8-ΟΣ5

Invitation: 10.4c.15.1.1 (MIS 4531) "Energy upgrading of Public Buildings in more developed regions"

Funding body: O.P. "TRANSPORT INFRASTRUCTURE, ENVIRONMENT & SUSTAINABLE DEVELOPMENT" NSRF 2014-2020

Implementing body: Hellenic Parliament – EPIS

Sub-project titles: 1. Supply of electromechanical equipment for chiller plant

                                2. Energy upgrading of the Parliament Building of the Hellenic Parliament

                                3. Issue of Energy Efficiency certificate after completion of the project

Final Beneficiary: Hellenic Parliament

Duration: 29 months

Summary

Reduction of the energy consumption of the Hellenic Parliament’s Main Building by means of Energy Saving interventions in the cooling system and in the building shell (thermal insulation of the roof / new window frames on the facades), BMS automation system (with interfacing to the lighting, cooling, heating system) .

Purpose

The Action is expected to address the critical problem of high-energy consumption and increased operating costs, in line with the general process of rationalization of public sector spending. Deliverables of Action are:

• New electromechanical equipment of the chiller plant in full operation.

• Increase the energy efficiency of the Hellenic Parliament’s main building by at least one (1) efficiency category- or decrease the energy consumption by at least 30% with newer, more efficient energy saving systems.

Results

The implementation of the measures will lead to a significant reduction in annual energy consumption, of at least 30%, while at the same time a significant reduction in carbon dioxide emissions will be achieved, amounting to 39% per year. Over time, significant cost savings will be accrued for the Greek state, while the reduction of CO2 emissions will also bring significant environmental benefits. The Action will also improve the viability and living conditions (heating / cooling) of the historical Parliament Building of the Hellenic Parliament, where parliamentary assemblies are held daily and citizen visits are hosted.

Previous Article "Restoration and layout of the listed building on 23 Filellinon Street"
Print
8522
Terms Of UsePrivacy StatementCopyright 2024 Hellenic Parliament
Back To Top